Bright Co’s revised brief is in. Three of your design tasks change.
Your mockups follow the old brief, and the new one drops the pricing page.
- What changed
- The pricing page is out; two new landing pages are in.
- History
- The last brief change took 4 days to reach design.
- Draft
- A note to Priya confirming the new scope and the pages to stop.
- Next steps
- Send the note (2 min). Re-estimate the two new pages (5 min).


